Pipe Shuttle Machine

Specifications

Modular Design
Adjusted to any derrick position with infill sections and easy X, Y, Z adjustments.
Efficiency
  • Protector free handling of tubulars
  • Complete hands free handling
  • Full guiding from pipe shuttle to drillfloor
  • Handles up to 5 tubulars in one run
Tubular Range
  • Drillpipe, casing and drill collars 2 3/8″ – 18 5/8″ – 14 m
  • Drilling and production riser
  • Subs, cement head, BHA’s, whipstock and general material handling
Safety Guide arm, safety arm, tubular protecting features, anti collision
Operation Automated operation from drillers cabin, pipe handling crane and wireless
Maintenance Easy access, high quality on all components

Contact us